Intel puts on hold Fab 42 in Arizona, will use for 'future technology'

The chipmaker announced in 2011 plans to spend $5 billion on Fab 42

Intel has put on hold a new chip manufacturing facility at its site in Chandler, Arizona, leaving the new space available for unspecified future technology.

The company said in February 2011 it was investing over US$5 billion in the new Fab 42, which was expected to be completed last year. The fab was to begin operations on a process that would allow the chipmaker to create transistors with a minimum feature size of 14 nanometers.

It was announced by former Intel President and CEO Paul Otellini during a visit by U.S. President Barack Obama to an Intel facility in Hillsboro, Oregon, and was highlighted by Obama as an example of U.S. manufacturing potential.

"First just so its clear we've been headed down this path for some time," Intel spokesman Chuck Mulloy said via email on Tuesday. He said the building for the new facility was completed on schedule.

The company will still be deploying 14-nanometer technology in Arizona, but will do it in existing fab space at the site rather than at the new facility to improve capital equipment efficiency and to leave the new space available for future technology, Mulloy said.

"By running both 14 and 22 nm processes at the same time we get better utilization of our equipment," he added. Mulloy did not specify what the new technologies were.

Intel's move comes amid a slump in the PC market. In 2013, unit PC shipments worldwide declined by 10 percent from 2012, with shipments declining for seven consecutive quarters, research firm IDC reported last week.

Computer chips remain the mainstay of Intel's business as the company tries to increase share in new markets like mobile computing and wearables. At the International CES trade show earlier this month, Intel announced its tiny Edison computer for wearable devices.

Intel has microprocessor facilities in Oregon, New Mexico, Ireland and Israel, besides the ones in Arizona.

The company was to employ over 1,000 staff at the facility which Mulloy told the Arizona Republic newspaper had already been added. The newspaper reported that there are about 11,900 full-time employees at Intel's two Chandler campuses, up from 9,700 full-time employees when plans for the facility were announced, the newspaper said.

John Ribeiro covers outsourcing and general technology breaking news from India for The IDG News Service. Follow John on Twitter at @Johnribeiro. John's e-mail address is john_ribeiro@idg.com

Join the newsletter!

Or

Sign up to gain exclusive access to email subscriptions, event invitations, competitions, giveaways, and much more.

Membership is free, and your security and privacy remain protected. View our privacy policy before signing up.

Error: Please check your email address.

Tags intelprocessorsManufacturingindustry verticalsComponents

Keep up with the latest tech news, reviews and previews by subscribing to the Good Gear Guide newsletter.

John Ribeiro

IDG News Service
Show Comments

Cool Tech

Toys for Boys

Family Friendly

Stocking Stuffer

SmartLens - Clip on Phone Camera Lens Set of 3

Learn more >

Christmas Gift Guide

Click for more ›

Brand Post

Most Popular Reviews

Latest Articles

Resources

PCW Evaluation Team

Aysha Strobbe

Microsoft Office 365/HP Spectre x360

Microsoft Office continues to make a student’s life that little bit easier by offering reliable, easy to use, time-saving functionality, while continuing to develop new features that further enhance what is already a formidable collection of applications

Michael Hargreaves

Microsoft Office 365/Dell XPS 15 2-in-1

I’d recommend a Dell XPS 15 2-in-1 and the new Windows 10 to anyone who needs to get serious work done (before you kick back on your couch with your favourite Netflix show.)

Maryellen Rose George

Brother PT-P750W

It’s useful for office tasks as well as pragmatic labelling of equipment and storage – just don’t get too excited and label everything in sight!

Cathy Giles

Brother MFC-L8900CDW

The Brother MFC-L8900CDW is an absolute stand out. I struggle to fault it.

Luke Hill

MSI GT75 TITAN

I need power and lots of it. As a Front End Web developer anything less just won’t cut it which is why the MSI GT75 is an outstanding laptop for me. It’s a sleek and futuristic looking, high quality, beast that has a touch of sci-fi flare about it.

Emily Tyson

MSI GE63 Raider

If you’re looking to invest in your next work horse laptop for work or home use, you can’t go wrong with the MSI GE63.

Featured Content

Don’t have an account? Sign up here

Don't have an account? Sign up now

Forgot password?