Inside Telstra's NBN

Telstra has devoted over three years and some 900 engineers to designing a national fibre network, and Acaltel has chipped-in 1000 of its own engineers who have devoted an estimated 1.5 million hours on the project. Telstra offered a glimpse of some of the technology behind its $10B bid for the National Broadband Network (NBN)

Inside Telstra's NBN prev next

Loading...

Old twisted pair copper cables are vulnerable to interference and need to be checked to preserve network integrity.

Prev Next 7/13

Comments on this image

Close

Inside Telstra's NBN

13 images
Shopping.com

Don’t have an account? Sign up here

Don't have an account? Sign up now

Forgot password?